The Montreal Métro: Difference between revisions

From TransitfanWiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 69: Line 69:
!Length
!Length
|- align="center"
|- align="center"
|1
|2
|style="background: orange; color: white"|'''Orange'''
|style="background: orange; color: white"|'''Orange'''
|31 (4 interchangeable, 6-7 more are planned.)
|31 (4 interchangeable, 6-7 more are planned.)
Line 82: Line 82:
!Length
!Length
|- align="center"
|- align="center"
|1
|3
|style="background: red; color: white"|'''Red'''
|style="background: red; color: white"|'''Red'''
|(plans called for 9 to 17)
|(plans called for 9 to 17)
Line 95: Line 95:
!Length
!Length
|- align="center"
|- align="center"
|1
|4
|style="background: Yellow; color: black"|'''Yellow'''
|style="background: Yellow; color: black"|'''Yellow'''
|3 (5 originally planned)
|3 (5 originally planned)
Line 108: Line 108:
!Length
!Length
|- align="center"
|- align="center"
|1
|5
|style="background: Blue; color: white"|'''Blue'''
|style="background: Blue; color: white"|'''Blue'''
|12 (20 originally planned. 7 additional are planned)
|12 (20 originally planned. 7 additional are planned)
Line 121: Line 121:
!Length
!Length
|- align="center"
|- align="center"
|1
|6
|style="background: White; color: Black"|'''NUL'''
|style="background: White; color: Black"|'''NUL'''
|
|
Line 134: Line 134:
!Length
!Length
|- align="center"
|- align="center"
|1
|7
|style="background: White; color: Black"|'''White'''
|style="background: White; color: Black"|'''White'''
|(12 stations were planned)
|(12 stations were planned)

Revision as of 19:15, 5 November 2010

The Montreal Métro

"The metro is for Montreal what the boulevards are for Paris or the canals for Venice." Jean-Claude Germain

History of the Montreal Métro

Rolling Stock

Canadian Vickers MR-63

Thumbnail Trailer Cars Motor Cars Year Lines served Traction Remarks
80-001 to 80-123 81-501 to 81-746 1965-1967 Line-1 Green & Line-4 Yellow
2x 113 kW (154 hp) traction motors

Bombardier MR-73

Thumbnail Trailer Cars Motor Cars Year Lines served Traction motor Remarks
78-001 to 78-141 79-501 to 79-782 1976-198x Line-2 Orange & Line-5 Blue 2x 124 kW (168 hp) traction motors

The Network

Line-1 Green

line color # of stations Length
1 Green 27 (2 interchangeable) 22.1 km

Line-2 Orange

line color # of stations Length
2 Orange 31 (4 interchangeable, 6-7 more are planned.) 30.0 km

Line-3 Red(Never built)

line color # of stations Length
3 Red (plans called for 9 to 17)

Line-4 Yellow

line color # of stations Length
4 Yellow 3 (5 originally planned) 4.25 km

Line-5 Blue

line color # of stations Length
5 Blue 12 (20 originally planned. 7 additional are planned) 9.7 km

Line-6 Colorless(Proposed upground LRT)

line color # of stations Length
6 NUL

Line-7 White(Never Built)

line color # of stations Length
7 White (12 stations were planned)