The Montreal Métro: Difference between revisions
From TransitfanWiki
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 45: | Line 45: | ||
|2x 124 kW (168 hp) traction motors | |2x 124 kW (168 hp) traction motors | ||
| | | | ||
|} | |||
====Bombardier/Alstom MPM-10==== | |||
{| cellpadding="10" class="wikitable sortable" | |||
!Thumbnail | |||
!Train number | |||
!scope="col" width="40" | Year | |||
!Lines served | |||
!Traction motor | |||
!Remarks | |||
|- align="center" | |||
| | |||
|Fleet numbers not decided yet | |||
|2012-2014~ | |||
|All | |||
|Not yet known | |||
| | |||
*Currently being designed | |||
*Prototype to be delivered in 2010 | |||
|} | |} | ||
Revision as of 00:13, 6 November 2010
The Montreal Métro
"The metro is for Montreal what the boulevards are for Paris or the canals for Venice." Jean-Claude Germain
History of the Montreal Métro
Inaugurated in 1966.
Rolling Stock
Canadian Vickers MR-63
Thumbnail | Trailer Cars | Motor Cars | Year | Lines served | Traction | Remarks |
---|---|---|---|---|---|---|
80-001 to 80-123 | 81-501 to 81-746 | 1965-1967 | Line-1 Green & Line-4 Yellow |
Bombardier MR-73
Thumbnail | Trailer Cars | Motor Cars | Year | Lines served | Traction motor | Remarks |
---|---|---|---|---|---|---|
78-001 to 78-141 | 79-501 to 79-782 | 1976-198x | Line-2 Orange & Line-5 Blue | 2x 124 kW (168 hp) traction motors |
Bombardier/Alstom MPM-10
Thumbnail | Train number | Year | Lines served | Traction motor | Remarks |
---|---|---|---|---|---|
Fleet numbers not decided yet | 2012-2014~ | All | Not yet known |
|
The Network
Line-1 Green
line | color | # of stations | Length |
---|---|---|---|
1 | Green | 27 (2 interchangeable) | 22.1 km |
Line-2 Orange
line | color | # of stations | Length |
---|---|---|---|
2 | Orange | 31 (4 interchangeable. 6-7 more are planned.) | 30.0 km |
Line-3 Red(Never built. Scrapped project.)
line | color | # of stations | Length |
---|---|---|---|
3 | Red | (plans called for 9 to 17) |
Line-4 Yellow
line | color | # of stations | Length |
---|---|---|---|
4 | Yellow | 3 (5 originally planned. 3-5 more planned) | 4.25 km |
Line-5 Blue
line | color | # of stations | Length |
---|---|---|---|
5 | Blue | 12 (20 originally planned. 7 additional are planned) | 9.7 km |
Line-6 Colorless(Proposed upground LRT. Scrapped project.)
line | color | # of stations | Length |
---|---|---|---|
6 | NUL |
Line-7 White(Never Built, still proposed)
line | color | # of stations | Length |
---|---|---|---|
7 | White | (12 stations were planned) |
|